Fees & Charges

1. Trip Charge (door hangers, disconnects, etc.) $35.00
2. Re-connection Charge (per utility) *normal business hours $35.00
3. After-hour Services. If a customer desires to have service outside the normal working hours, They will be informed that the charge will be based on the 2.5 hour call time of the employee on call.
4. Returned Check Charge $25.00
5. Meter Testing Fee
If meter is tested by an independent source, fee will be actual expense incurred by the Board.
$50.00
6. New Account Fee $25.00
7. Meter Sockets
Any socket above the standard 200 amp socket will be charged difference in cost.
 8.  Pole Attachment Annual Fee  $5.00 per pole
9. Pole Attachment Appendix-A Rates and Fees Click Here
10. Single Phase Overhead Line Extensions (footage over 600 feet) $  4.73 per foot
11. Single Phase Underground Line Extension $  7.50 per trench foot
12. Three Phase Underground Line Extension $15.00 per trench foot
13. Water Tap – certain circumstances may warrant additional charges.
1”
1.5”
2”
Any water tap over 2” will be at cost. A deposit of $2,500 must be paid at time of application.
$1,500
$1,500
$1,500
14. Water and Sewer Construction Inspection Fee – 24 hour notice must be given for requested inspection. There is no fee unless the customer desires the inspection to be after normal working hours. The fee will then be that as stated in Item #3.
15. Sewer Tap Inspection Fee – 24 hour notice must be given for requested inspection. There is no fee unless the customer desires the inspection to be after normal working hours. The fee will then be that as stated in Item #3.
16. Prints of Maps
Photo Printing
$9.00 per sheet
$30.00 per sheet

Last approved December 2016 – subject to review